I would love to get input from you guys, especially those who favor shorter cycles ,on the plan below. This is set up in repeatable 10 week blocks consisting of a 7 week ON phase followed by a 3 week PCT phase:
Weeks 1-6: Test Prop - 100 mg EOD, Nolvadex - 10mg ED
Week 7: Test Prop (tapered) - 100, 75, 50 mg (MWF), Nolvadex - 10 mg ED
Week 8: Nolvadex - 40mg ED, Clomid - 100 mg ED
Week 9: Nolvadex - 30mg ED, Clomid - 50 mg ED
Week 10: Nolvadex - 20mg ED, Clomid - 50 mg ED
This 10 week block would be repeated 3-4 times followed by an extended PCT/OFF phase.
Adjustments if progress stalls:
- Increasing Test Prop (not exceeding 150mg EOD)
- Adding either 25mg Dianabol ED or 50 mg Anadrol ED for weeks 1-4
Additional thoughts:
- Substituting Arimidex at 0.25 mg EOD for Nolvadex in weeks 1-7
- Increasing duration of PCT phase if deemed necessary based on sides. This is not expected due to conservative nature of the ON phase.
Any positive or negative criticism is greatly appreciated.
Weeks 1-6: Test Prop - 100 mg EOD, Nolvadex - 10mg ED
Week 7: Test Prop (tapered) - 100, 75, 50 mg (MWF), Nolvadex - 10 mg ED
Week 8: Nolvadex - 40mg ED, Clomid - 100 mg ED
Week 9: Nolvadex - 30mg ED, Clomid - 50 mg ED
Week 10: Nolvadex - 20mg ED, Clomid - 50 mg ED
This 10 week block would be repeated 3-4 times followed by an extended PCT/OFF phase.
Adjustments if progress stalls:
- Increasing Test Prop (not exceeding 150mg EOD)
- Adding either 25mg Dianabol ED or 50 mg Anadrol ED for weeks 1-4
Additional thoughts:
- Substituting Arimidex at 0.25 mg EOD for Nolvadex in weeks 1-7
- Increasing duration of PCT phase if deemed necessary based on sides. This is not expected due to conservative nature of the ON phase.
Any positive or negative criticism is greatly appreciated.